PROJECTS IN PROGRESS:


 

Backup Well Project - Brightwater

Construction of backup wells, pump station, and transmission main to mitigate against potential Brightwater Tunnel leakage.

--------------------------------------------------------------------

Phase I - Bid Advertisement

Contract Documents, Geotechnical Report and Plans may now be downloaded. For those requiring a hard copy, please drop by the district office with $50 for a complete set.  If you wish to have plans mailed to you contact us with your address. 
Please send your contact info including phone and fax number to engr @ lfpwd.org to be placed on the plan-holders list which will give you timely updates and addenda.

Addendum #1, Addendum #2

Planholders List

Preliminary Untabulated Bid Results

3KINGS ENVIRONMENTAL $767,227.08
AWARD CONSTRUCTION $667,963.14
FURY SITE WORKS $563,498.86
GARY HARPER CONSTRUCTION $600,691.82
MARSHBANK CONSTRUCTION INC $537,083.81
NEW WEST DEVELOPMENT $687,664.38
PACIFIC COAST GENERAL $647,368.93
PELLCO CONSTRUCTION INC $712,845.00
SANTANA TRUCKING & EXCAVATING $614,054.10
TAYLOR EXCAVATING $535,252.43
WESTWATER CONSTRUCTION CO $724,539.60
RRJ CONSTRUCTION $526,728.95

Tabulated Bid Results

Contract Total By Schedule RRJ Company Taylors Excavating Marshbank Const. Fury Site Works Gary Harper Constr. Santana Truck/Excav Pacific Coast Award Construction New West Devel Pellco Construction Westwater Constr. 3Kings Enviromental Average Bid
Schedule "A" - Off-site Watermain 157,389.00 159,030.00 158,190.00 159,952.15 204,784.00 156,525.00 200,220.95 190,477.00 256,743.00 229,985.00 244,555.00 227,984.00 195,486.26
Schedule "B" - On-site Access Road, Watermain and Utilities 271,632.00 293,405.00 275,887.50 302,325.68 298,233.00 333,655.00 327,060.00 361,535.00 316,210.00 338,000.00 321,225.00 392,430.00 319,299.85
Schedule "C" - General Items 50,800.00 36,250.00 56,410.00 52,333.00 49,700.00 70,600.00 60,325.00 58,000.00 55,051.00 78,500.00 86,900.00 80,250.00 61,259.92
Sub-total Before Local Sales & Use Tax 479,821.00 488,685.00 490,487.50 514,610.83 552,717.00 560,780.00 587,605.95 610,012.00 628,004.00 646,485.00 652,680.00 700,664.00 576,046.02
Local Sales & Use Tax (9.5%) 45,583.00 46,425.08 46,596.31 48,888.03 52,508.12 53,274.10 55,822.57 57,951.14 59,660.38 61,416.08 62,004.60 66,563.08 54,724.37
Total Project Cost including SST 525,404.00 535,110.08 537,083.81 563,498.86 605,225.12 614,054.10 643,428.52 667,963.14 687,664.38 707,901.08 714,684.60 767,227.08 630,770.40
Contractor Total
526,728.95 535,252.43 537,083.81 563,498.86 600,691.82 614,054.10 647,368.93 667,963.14 687,664.38 712,845.00 724,539.60 767227.08
Difference
-1,324.95 -142.35 0.00 0.00 4,533.30 0.00 -3,940.41 0.00 0.00 -4,943.92 -9,855.00 0.00

 

Notice of Award

Project Construction Letter

--------------------------------------------------------------

Phase II - Stage - Design of building layout, tank, pumps

 

RECENTLY COMPLETED PROJECTS:


 

 

Ballinger Way NE (NE 184th St to NE 178th St.) - Completed 9/11

Nearly 1500ft of 12" ductile iron replacing 6" steel to increase fire flow to mall

 

Intermediate Zone Improvements Phase IV - Completed 8/11

Wellhead Area - Replace 130ft of 6" steel with 8" ductile iron on hillside

Wellhead Area - Horizontal direction drill and open trench 900ft of new water main

NE 185th St - Replace 360ft of water main and pressure reducing valves

40th PL to 188th St - Nearly 1000ft of new main and pressure reducing valves

 

182nd PL NE - Over 3500ft of Water Main Replacement - Completed 9/10

 

High Zone Steel Standpipe Refurbish -  Completed 4/10

Includes installation of mixing manifold to avoid stagnant water and tank repainting

 

NE 187th PL - Completed 9/09

Watermain replaces 360ft of asbestos-cement pipe with ductile iron and HDPE

 

NE 47th PL Cul-De-Sac - Completed 5/09

Watermain replaces 300ft of corroded steel pipe with ductile iron and HDPE

 

Newly Painted Tank

 


Contract Total By Schedule Bid Value Ext 8/10/11 Ext. 8/23/11 Ext. 9/9/11 Total Payments Diff. % Diff Contract Total By Schedule RRJ Company Taylors Excavating Marshbank Const. Fury Site Works Gary Harper Constr. Santana Truck/Excav Pacific Coast Award Construction New West Devel Pellco Construction Westwater Constr. 3Kings Enviromental Average Bid
Schedule "A" - Off-site Watermain $0.00 $0.00 $0.00 $0.00 $0.00 #DIV/0! Schedule "A" - Off-site Watermain 157,389.00 159,030.00 158,190.00 159,952.15 204,784.00 156,525.00 200,220.95 190,477.00 256,743.00 229,985.00 244,555.00 227,984.00 195,486.26
Schedule "B" - On-site Access Road, Watermain and Utilities $0.00 $0.00 $0.00 $0.00 $0.00 #DIV/0! Schedule "B" - On-site Access Road, Watermain and Utilities 271,632.00 293,405.00 275,887.50 302,325.68 298,233.00 333,655.00 327,060.00 361,535.00 316,210.00 338,000.00 321,225.00 392,430.00 319,299.85
Schedule "C" - General Items $0.00 $0.00 $0.00 $0.00 $0.00 #DIV/0! Schedule "C" General Items 50,800.00 36,250.00 56,410.00 52,333.00 49,700.00 70,600.00 60,325.00 58,000.00 55,051.00 78,500.00 86,900.00 80,250.00 61,259.92
$0.00
Sub-total Before Local Sales & Use Tax $0.00 $0.00 $0.00 $0.00 $0.00 #DIV/0! Sub-total Before Local Sales & Use Tax 479,821.00 488,685.00 490,487.50 514,610.83 552,717.00 560,780.00 587,605.95 610,012.00 628,004.00 646,485.00 652,680.00 700,664.00 576,046.02
Local Sales & Use Tax (9.5%) $0.00 $0.00 $0.00 $0.00 $0.00 Local Sales & Use Tax (9.5%) 45,583.00 46,425.08 46,596.31 48,888.03 52,508.12 53,274.10 55,822.57 57,951.14 59,660.38 61,416.08 62,004.60 66,563.08 54,724.37
Total Project Cost including SST $0.00 $0.00 $0.00 $0.00 $0.00 #DIV/0! Total Project Cost including SST 525,404.00 535,110.08 537,083.81 563,498.86 605,225.12 614,054.10 643,428.52 667,963.14 687,664.38 707,901.08 714,684.60 767,227.08 630,770.40
5% Witholding (on Subtotal before SST) $0.00 $0.00 $0.00 $0.00 Contractor Total 526,728.95 535,252.43 537,083.81 563,498.86 600,691.82 614,054.10 647,368.93 667,963.14 687,664.38 712,845.00 724,539.60 767227.08
Progress Release $0.00 $0.00 $0.00 $0.00 Difference -1,324.95 -142.35 0.00 0.00 4,533.30 0.00 -3,940.41 0.00 0.00 -4,943.92 -9,855.00 0.00
Witholding Release on Project Completion $0.00
























Final Total Payment $0.00