ADVERTISEMENT FOR BIDS - LAKE FOREST PARK WATER DISTRICT

Notice is hereby given that Lake Forest Park Water District (“District”) will receive sealed bids for Backup Well Infrastructure Phase I - Access Road, Watermain and Utilities until 10 AM on Wednesday, November 2, 2011, at the office of Lake Forest Park District, Lake Forest Park, Washington 98155, at which time all bids will be opened and read.

Work under this Contract principally consists of the following:

  • 900 lin-ft 8” ductile iron pipe and fittings
  • 180 lin-ft 10” ductile iron pipe and fittings
  • Pressure Reducing valve vault and check valve in precast vault (10” PRV supplied by owner)
  • Tree Removal, Clearing, Grubbing
  • Soldier Pile Retaining Wall
  • Access Road Construction
  • Steel Reinforced Wood Beam Guard Railing and pedestrian Safety Railing
  • 400 lin-ft 8” Watermain HDPE DR17 partially cased in 12” HDPE DR21
  • Water meter vault & fittings, mag meter supplied by owner
  • Electrical service installation including conduit from pole to meter pedestal and conduit, pull boxes for servicing pump control building and conduit for future connections as indicated on plans.
  • Communications conduit and pull boxes

The Contract Documents may be obtained at the District office for the nonrefundable purchase price of $50.00.  Those wishing to have a set mailed shall include an additional nonrefundable $10.00 for postage and handling.  Checks shall be made payable to Lake Forest Park Water District.  Copies of Contract Documents and plans are on file and available for public inspection at the District office during regular business hours (8:00 a.m. to 4:30 p.m.).

Proposals shall be on forms included in the Contract Documents and shall be accompanied by a certified or cashier’s check, or a guaranty bid bond, payable to the order of the Lake Forest Park District, in an amount not less than 5 percent of the amount of the proposal, as a guaranty that the bidder will execute the Contract if awarded in conformance with the proposal.  The successful bidder will be required to furnish performance and payment bonds in an amount not less than 100 percent of the contract price.   

The Contractor awarded the Work shall start within ten (10) calendar days from the date of issuance of Notice to Proceed.  The District will evaluate proposals based on the total amount of the bid. The District reserves the right to reject any or all proposals and to determine which proposal is, in the judgment of the District, the lowest responsible proposal, and which proposal, if any, should be accepted in the best interests of the District.  The District also reserves the right to waive any informalities or irregularities in any proposal.

Proposals received after the time announced for the opening will not be considered.  No bidder may withdraw its bid after the time announced for the opening, or before the award and execution of the Contract, unless the award is delayed for a period exceeding ninety (90) days.

Secretary, Board of Commissioners,

Lake Forest Park Water District

 
Newsletter August 2011 PDF Print E-mail

Download Corrected Full Color Newsletter

Dear Customer, please read this newsletter for advisories and other important information from your water provider.  Included is information regarding:

  • Brightwater Tunnel Project
  • Conservation Tips
  • Projects  Underway in 2011
  • Non-Acute Coliform MCL Violation
Read more...
 
Ballinger Construction Customer Letter PDF Print E-mail

PDF Customer Letter

Dear Customer:

Lake Forest Park Water District is doing construction work near your home.  A new watermain and valves are being installed on the West shoulder of Ballinger Way between 184th Street and 178th Street.

Background – Why are we doing this project?:

Our District has over 12 miles of pipes that bring water to about 2500 residents.  The water is sourced from deep wells and artesian wells in the District’s 12 acre wellhead protection area near 49th Place. N.E.   The new water pipe that will be installed on your Street will provide a more reliable water supply and improved fire flow for customers south of 184th Street including the Lake Forest Park Towne Center which will lose a backup connection pipe from Seattle at the end of 2011.

The project title is “Ballinger Way 184th to 178th Watermain Project” and it involves around 1500 feet of 12” ductile iron watermain and connections.   The contractor who has been awarded this construction project is B & L Utility of Snohomish, WA.   B & L Utility is a very experienced contracting company with an excellent work history installing underground pipes.

Read more...
 
District Fund Misappropriation Press Release PDF Print E-mail

Lake Forest Park Water District (District) Investigating Possible Misappropriation of Public Funds.
Lake Forest Park, WA, 7/12/2011

Contact: Lake Forest Park Water District
Contact Person: F. Alan Kerley, General Manager
Telephone: 206-365-3211
Fax: 206-365-3357
Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Web site: www.lfpwd.org

 

The State Auditor’s Office (SAO) and LFPPD (Lake Forest Park Police Dept.) are currently conducting investigations for misappropriation of District Maintenance and Petty cash accounts. The District requested the involvement of the SAO and the Police Dept. It is inappropriate to comment while these investigations are under way. Further questions at this point should be directed to SAO and the LFPPD.

Any loss of ratepayer funds is covered by an insurance policy that the District has in place through the Water and Sewer Risk Management Pool located in Bellevue, Washington.
The District may be able to comment further at a later time when SAO and LFPPD investigations have been completed.

Lake Forest Park Water District has been proud to serve pure, chemical free water to the residents of Lake Forest Park since 1948.

 
Ad Ballinger PDF Print E-mail

 

ADVERTISEMENT FOR BIDS

LAKE FOREST PARK WATER DISTRICT

 

Notice is hereby given that Lake Forest Park Water District (“District”) will receive sealed bids for the Ballinger Way 184th to 178th Watermain Project until 10 AM on May 25, 2011, at the office of Lake Forest Park District, 4029 NE 178th, Lake Forest Park, WA 98155, at which time all bids will be opened and read.  Project Engineer's Estimate $350,000

 

Read more...
 
<< Start < Prev 1 2 3 Next > End >>

Page 1 of 3